Main Contractor: Adco Contracting Ltd
Date: November, 2021
Scope: Removal of finishes to an existing building and installation of 1300m2 of a new Sikaplan G warm roof system to flat areas complete with tapered insulation to create falls. Installation of a coloured walkway to roof and a new counterbalance handrail system to the perimeter of the building.